Jones Construction

Family Owned Since 1952

Faith ChapelProject Details: Faith Chapel

  • Architectural Detail
  • Exterior
  • Architectural Detail

Faith Chapel selected Jones Construction to help them create an impressive and versatile new facility. The striking exterior is composed of aluminum composite polymer panels and concrete panels that evoke the sandstone of the surrounding Rimrocks. Visitors are welcomed by a greeting area including a coffee shop and lounge areas. Custom-built steel and glass railing systems and granite stair treads are found throughout the dramatic interior that reaches 48' from floor to ceiling.

The state of the art audio/video systems are truly remarkable and enhance their presentation capabilities and versatility. A kids ministry area with themed fixtures and artwork on walls and a 2-story administrative area with over 40 offices both add to the flexibility.

Project Gallery

Project Specs

  • 85,000 SF performing arts center/church with seating for 1,800 including a 600 seat balcony
  • 11 acres incorporating signage and parking for 1,050 vehicles
  • Completion time:
    12 months
  • Location:
    517 Shiloh Rd
    Billings, Montana 59102